Troubled Winona bridge needs more repairs
Go Deeper.
Create an account or log in to save stories.
Like this?
Thanks for liking this story! We have added it to a list of your favorite stories.

A Mississippi River bridge between southeastern Minnesota and southwest Wisconsin that authorities closed for repairs last summer needs more work.
During a routine inspection, inspectors found concrete flaking from the Interstate Bridge that connects downtown Winona to Wisconsin.
Crews closed the bridge for 11 days last year when inspectors found severely corroded gusset plates. A MnDOT spokeswoman says the current problems don't pose a similar danger and that there's no need to close the bridge this time.
Crews will temporarily close a parking lot beneath the bridge on the Minnesota side as they patch up the flaking concrete. After it's fixed, inspectors will analyze the bridge deck to see if more repairs are needed.
---
Information from: Winona Daily News, http://www.winonadailynews.com
(Copyright 2009 by The Associated Press. All Rights Reserved.)
Turn Up Your Support
MPR News helps you turn down the noise and build shared understanding. Turn up your support for this public resource and keep trusted journalism accessible to all.

