Bachmann: Shutdown shows need for new Stillwater Bridge
Go Deeper.
Create an account or log in to save stories.
Like this?
Thanks for liking this story! We have added it to a list of your favorite stories.
GOP Rep. Michele Bachmann issued a news release today saying that a potential state government shutdown shows the need for a new bridge in Stillwater. State officials announced last week that the lift bridge will not be operating if state government shuts down on July 1.
Bachmann said the problem is proof a new bridge needs to be built.
"The prospect of the Stillwater Lift Bridge being locked in the 'up' position during a state government shutdown serves as another compelling reason for a new St. Croix River crossing. The bridge closure will result in more than 16,000 rerouted daily drivers experiencing increased travel times that will raise the cost of their daily commute.
"The 80-year-old lift bridge has been in need of replacement for decades, and we are now closer than ever to a new crossing. This spring I introduced a bipartisan bill in the House, and Senator Amy Klobuchar (MN) introduced a similar bill with bipartisan support in the Senate, that would allow the river crossing project to move forward. I urge my colleagues to give these bills immediate attention. Once a new bridge exists, the Minnesota and Wisconsin residents who frequently cross the river will not have to worry about the impact that operational delays of the lift bridge will have on their daily commute."
Bachmann also said federal law requires lift bridges to remain open if no operator is available.
Turn Up Your Support
MPR News helps you turn down the noise and build shared understanding. Turn up your support for this public resource and keep trusted journalism accessible to all.
